Announcements

CLARIFICATION NO. 3

10.04.2023

RFB No: AF EIP ICB-1.5.1.1
Project: ADDITIONAL FINANCING FOR “EDUCATION IMPROVEMENT
PROJECT”
Purchaser: Center for Education Projects PIU SA
Country: Armenia
CLARIFICATION NO. 3, answers to questions received on 4 April 2023

Question 
1. List of Related Services and Completion
Schedule – Lot 1-7 and GCC 26.01
Inspection on correspondence to the Technical
Specifications offered in the Supplier's Bid
(Conformity to the Technical Specifications)
and on physical conditions (Defects and
Damages Inspection) at the premises of the
Supplier before delivery to the final destination
points for the five sample.
Can you kindly clarify which samples will be
inspected during this phase.

Answer

Samples will be selected randomly, five random
samples will be selected for each product line.

2. Lot 3: Accessories and appliance for Biology
and Chemistry Laboratories
Items:
91.Silicone hose 6 mm /the inside diameter of the cross-section of the hose/ No 1780

92.Silicone hose 2 mm /the inside diameter of the cross-section of the hose/ No 1780

93. Silicone Vacuum Hose 5 mm /the inside diameter of the cross- section of the hose/ No 890

Can you kindly inform us about the length of the
tube required and the outside diameter or
thickness of the tube wall?

Answer

Please see below:
N 91 outside diameter of the tube 7 ± 10 mm
N 92 thickness of the tube wall 1,5 mm
N 93 outside diameter of the tube 6 ± 10 mm 

Updates

19.03.2026 Signing of Grant Agreements for the Establishment of Pre-Schools Within the frameworks of the "Education Improvement Project Additional Financing" (EIP AF) loan project the provision of grants for the establishment of preschool institutions is ongoing. The project aims to increase the involvement of children in pre-school education institutions, to prepare children for entering the primary school thus ensuring the smooth transition. On March 19 meetings with the directors of educational institutions of RA Vayots Dzor region were held at the... 16.03.2026 Signing of Grant Agreements for the Establishment of Pre-Schools Within the frameworks of the "Education Improvement Project Additional Financing" (EIP AF) loan project the provision of grants for the establishment of preschool institutions is ongoing. The project aims to increase the involvement of children in pre-school education institutions, to prepare children for entering the primary school thus ensuring the smooth transition. On March 16 and 25 meetings with the directors of educational institutions of RA Shirak region were held at... 30.12.2025 Happy New Year and Merry Christmas. Dear Colleagues, We warmly congratulate you on the occasion of the New Year and Christmas. The past year has been significant for the development of the education system. Thanks to our dedicated efforts, modern laboratories and centers of excellence have been established in higher education institutions, preschools have been founded both in the regions and in the capital, innovative laboratory environments have been introduced in schools, and major renovation projects of high schools...